Takt Time Calculator helps logistics and supply chain professionals optimize operations and reduce costs.

Formel

Takt Time = Available Production Time / Customer Demand

Trin-for-trin guide

  1. 1Divide available time by units demanded to pace production
  2. 2Apply the formula with your specific values
  3. 3Use the result to optimize operations or costs

Løste eksempler

Input
480 min/day, 240 units demanded
Resultat
Takt Time = 480/240 = 2 min/unit

Almindelige fejl at undgå

  • Using incorrect units or dimensions in the calculation
  • Ignoring surcharges and accessorial fees