Skip to main content
Calkulon

Kuinka laskea Reorder Point

Mikä on Reorder Point?

Calculates the inventory level at which to place a new order to avoid stockouts. Accounts for lead time and demand variability.

Kaava

Formula: reorder point = (D × LT) + SS
D
D value — Variable used in the calculation
LT
LT value — Variable used in the calculation
SS
SS value — Variable used in the calculation

Vaiheittainen opas

  1. 1Average daily demand (D)
  2. 2Lead time in days (LT)
  3. 3Safety stock (SS)
  4. 4Formula: reorder point = (D × LT) + SS
  5. 5Reorder when inventory reaches this level

Ratkaistut esimerkit

Syöte
50/day use, 5day lead
Tulos
Order at 250

Yleisiä virheitä vältettäväksi

  • Ignoring lead time variability
  • Not updating for seasonal demand changes

Usein kysytyt kysymykset

Why is reorder point important?

Prevents stockouts by triggering orders in advance, accounting for lead time.

How does lead time affect reorder point?

Longer lead times require higher reorder points and more safety stock.

Oletko valmis laskemaan? Kokeile ilmaista Reorder Point-laskuria

Kokeile itse →

Asetukset

YksityisyysEhdotTietoja© 2026 Calkulon