Skip to main content
Calkulon
मार्गदर्शिकाएँ पर वापस जाएँ
3 min read6 चरण

How to Calculate OEE: Step-by-Step Guide

Learn to calculate Overall Equipment Effectiveness manually

गणित छोड़ें - कैलकुलेटर का उपयोग करें →

चरण-दर-चरण निर्देश

1

Gather Your Inputs

First, identify the operating time, total time, total output, ideal output, good output, and total output for the period you want to calculate the OEE for. Ensure all times and outputs are in the same units.

2

Calculate Availability

Next, calculate the availability by dividing the operating time by the total time and multiplying by 100. For example, if the operating time is 480 minutes and the total time is 600 minutes, the availability would be (480 / 600) × 100 = 80%.

3

Calculate Performance

Then, calculate the performance by dividing the total output by the ideal output and multiplying by 100. For instance, if the total output is 400 units and the ideal output is 500 units, the performance would be (400 / 500) × 100 = 80%.

4

Calculate Quality

After that, calculate the quality by dividing the good output by the total output and multiplying by 100. If the good output is 380 units and the total output is 400 units, the quality would be (380 / 400) × 100 = 95%.

5

Calculate OEE

Finally, calculate the OEE by multiplying the availability, performance, and quality. Using the previous examples, OEE = 80% × 80% × 95% = 0.8 × 0.8 × 0.95 = 0.608 or 60.8%.

6

Interpret Your Results and Consider Using a Calculator

Compare your OEE result to world-class benchmarks. Generally, a score of 85% or higher is considered world-class. For convenience and to avoid common mistakes such as calculation errors, consider using an OEE calculator for regular assessments.

Introduction to OEE

The Overall Equipment Effectiveness (OEE) is a measure of how well a manufacturing process is performing. It takes into account three key factors: availability, performance, and quality. In this guide, we will walk you through the steps to calculate OEE manually and provide a worked example.

Understanding the Formula

The OEE formula is: OEE = Availability × Performance × Quality Where:

  • Availability = (Operating Time / Total Time) × 100
  • Performance = (Total Output / Ideal Output) × 100
  • Quality = (Good Output / Total Output) × 100

Step-by-Step Calculation

गणना करने के लिए तैयार हैं?

मैन्युअल काम छोड़ें और तुरंत परिणाम प्राप्त करें।

कैलकुलेटर खोलें

संबंधित स्मार्ट सामग्री

Ratings & comments

…

सेटिंग्स