Skip to main content
Calkulon

物流・サプライチェーン

Cycle Time Calculator

詳細ガイド 近日公開

Cycle Time Calculatorの包括的な教育ガイドを準備中です。ステップバイステップの解説、数式、実例、専門家のヒントをお届けしますので、もうしばらくお待ちください。

💡

プロのヒント

Measure cycle time during the first hour and last hour of a shift separately — cycle times often differ due to startup effects (slower at the beginning as operators warm up) and fatigue effects (slower near end of shift) or end-of-shift rushing (faster but potentially lower quality). Understanding within-shift cycle time variation helps schedulers plan realistic daily output targets rather than using a single average.

難易度:中級

ご存知でしたか?

Toyota's Takt-based production system requires that every workstation on an assembly line has a cycle time that fits within takt time. In the 1990s, Toyota engineers spent months analyzing and documenting the standard cycle time for every single operation in a vehicle assembly — over 30,000 individual work elements — creating the foundation for their famous Standard Work sheets. This meticulous cycle time documentation is why Toyota can consistently produce a vehicle every 57 seconds per plant while maintaining world-class quality.

Mathematically verified
Reviewed May 2026
Used 26K+ times
Our methodology
🔒
100% 無料
登録不要
正確
検証済み数式
即座
即座に結果を表示
📱
モバイル対応
全デバイス対応

設定