Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

Stapsgewijze handleiding

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

Uitgewerkte voorbeelden

Invoer
30 items, 10/col
Resultaat
WIP limited

Veelgemaakte fouten om te vermijden

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

Veelgestelde vragen

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.