learn.howToCalculate
learn.whatIsHeading
Measures the rate at which a process produces output (units per hour/day). Indicates production efficiency and constraint locations.
Stapsgewijze handleiding
- 1Record units completed in time period
- 2Account for downtime and changeovers
- 3Divide total units by total time available
- 4Track over time and by shift
- 5Identify bottlenecks
Uitgewerkte voorbeelden
Invoer
100 parts/8hrs
Resultaat
12.5 parts/hr
Veelgemaakte fouten om te vermijden
- ✕Not accounting for quality in throughput (counting defects)
- ✕Ignoring equipment downtime impact
Veelgestelde vragen
What's good throughput?
Varies by process; track trends to ensure improvement; 5-10% annual gains typical with optimization.
How do I increase throughput?
Remove bottlenecks, improve equipment, better scheduling, reduce waste, and improve worker training.
Klaar om te berekenen? Probeer de gratis Throughput-rekenmachine
Probeer het zelf →