learn.howToCalculate
learn.whatIsHeading
Calculates the inventory level at which to place a new order to avoid stockouts. Accounts for lead time and demand variability.
Formel
Formula: reorder point = (D × LT) + SS
- D
- D value — Variable used in the calculation
- LT
- LT value — Variable used in the calculation
- SS
- SS value — Variable used in the calculation
Trinn-for-trinn guide
- 1Average daily demand (D)
- 2Lead time in days (LT)
- 3Safety stock (SS)
- 4Formula: reorder point = (D × LT) + SS
- 5Reorder when inventory reaches this level
Løste eksempler
Inndata
50/day use, 5day lead
Resultat
Order at 250
Vanlige feil å unngå
- ✕Ignoring lead time variability
- ✕Not updating for seasonal demand changes
Ofte stilte spørsmål
Why is reorder point important?
Prevents stockouts by triggering orders in advance, accounting for lead time.
How does lead time affect reorder point?
Longer lead times require higher reorder points and more safety stock.
Klar til å beregne? Prøv den gratis Reorder Point-kalkulatoren
Prøv selv →